Documents

Traverse City, MI: Community Wind Project

Traverse City, Michigan was the first municipal utility in the state to install a utility scale turbine in 1996.

Excerpt for this case study from the Michigan Energy Office.

Traverse City Light & Power Wind Generator
DESCRIPTION:

In June 1996, Traverse City Light & Power dedicated the first utility scale wind turbine generator in Michigan. The wind turbine is a Vestas model V-44, 600 kW generator and has a blade diameter of 144 ft. on a 160 ft. tower. The wind turbine has a variable blade pitch mechanism which can capture the most energy from winds. In average annual winds of between 14-15 mph the annual production from the wind turbine is estimated between 1.1-1.2 million kWh's which is enough electricity for approximately 200 average Traverse City homes. The capital cost of approximately $650,000 was partially funded by a $50,000 grant from the State of Michigan and the U.S. Dept. of Energy's State Energy Program.

Wind Energy Land Agreements: Best Practices and Policy Recomendations

The Wind Easement Workgroup developed a list of recommended policies and practices for facilitating orderly and sustainable wind energy development. These policies are designed to protect landowners, enhance economic development opportunities in wind energy, and broaden access to wind energy market information.

Click on the link below to read the document.

Pages

Subscribe to Documents
</